Network in development. Our first locations are being prepared and are clearly labelled on the map; public charging starts after commissioning. Suggest a location or ask for details.

← Back to the map

Suceava · Centru

Bulevardul 1 Mai, Suceava, Suceava, 720224

Under construction

Last reported: Location in preparation

What you will find here

Address

Bulevardul 1 Mai, Suceava, Suceava, 720224

Opening hours

Open 24/7

Parking

Surface parking

Amenities

  • Toilet
  • Café
  • Restaurant
  • Shop

Charging points

Status and last-report time are shown separately. A tariff appears only when one is configured.

CCS Combo 2

EVO-SVC01-001 · 150 kW DC

Free

≈ 750 km added in an hour · 20% → 80% in ≈ 14 min for a 60 kWh battery

Last reported:

CCS Combo 2

EVO-SVC01-001 · 150 kW DC

Free

≈ 750 km added in an hour · 20% → 80% in ≈ 14 min for a 60 kWh battery

Last reported:

Type 2 (Mennekes)

EVO-SVC01-002 · 22 kW AC

Free

≈ 115 km added in an hour

Last reported:

Type 2 (Mennekes)

EVO-SVC01-002 · 22 kW AC

Free

≈ 115 km added in an hour

Last reported:

Indicative estimates at the connector’s maximum power and a reference consumption of 18 kWh/100 km. The car, battery, temperature and charging curve can change the result significantly.